Composite Photograph of the North Elevation of Battersea Power Station
Location No. 6
Shot on the Arca Swiss F-Line Metric and Phase one digital back.
“I have been photographing Battersea Power Station's redevelopment for Battersea Power Station Development Company (BPSDC) or 6 years - 2014 - 2020, I have been photographing inside the construction site and off site from a number of locations in London.
Extension of Time is the first project to come from this body of work.
For 6 years I have made monthly visits to the same locations near the Power Station. The product of this photography are; Composite images from overlaying the same image taken over 6 years creating a ghost-like image of the subject over 6 years, grid layout images showing the subject changing over 6 years and individual photographs of the subject at a moment in time over the 6 year time span”.
Print size includes border, Vat and shipping included in the price.
Shipping destinations: UK, EU, USA & Canada, Australia and ROW.
Framed options are not available right now.
7.2" x 11.0" (18cm x 28cm) - £100.00
11.9" x 18.0" (30cm x 46cm) - £150.00
16.9" x 26.0" (43cm x 66cm) -£650.00
24.3" x 38.0" (62cm x 97cm) - £1200.00
30.5" x 48.0" (77cm x 122cm) - £1500.00
Bespoke prints can be requested and these are the maximum dimensions for a single print: cm / Inch
152.4 / 60 by 1193.8 / 470
Composite Photograph of the North Elevation of Battersea Power Station
Location No. 6
Shot on the Arca Swiss F-Line Metric and Phase one digital back.
“I have been photographing Battersea Power Station's redevelopment for Battersea Power Station Development Company (BPSDC) or 6 years - 2014 - 2020, I have been photographing inside the construction site and off site from a number of locations in London.
Extension of Time is the first project to come from this body of work.
For 6 years I have made monthly visits to the same locations near the Power Station. The product of this photography are; Composite images from overlaying the same image taken over 6 years creating a ghost-like image of the subject over 6 years, grid layout images showing the subject changing over 6 years and individual photographs of the subject at a moment in time over the 6 year time span”.
Print size includes border, Vat and shipping included in the price.
Shipping destinations: UK, EU, USA & Canada, Australia and ROW.
Framed options are not available right now.
7.2" x 11.0" (18cm x 28cm) - £100.00
11.9" x 18.0" (30cm x 46cm) - £150.00
16.9" x 26.0" (43cm x 66cm) -£650.00
24.3" x 38.0" (62cm x 97cm) - £1200.00
30.5" x 48.0" (77cm x 122cm) - £1500.00
Bespoke prints can be requested and these are the maximum dimensions for a single print: cm / Inch
152.4 / 60 by 1193.8 / 470