Skip to Content
BPSPP.
BPSPP.
BPSPP Gallery
BPSPP Print Shop
About
Meet the Photographers
0
0
BPSPP.
BPSPP.
BPSPP Gallery
BPSPP Print Shop
About
Meet the Photographers
0
0
BPSPP Gallery
BPSPP Print Shop
About
Meet the Photographers
Print Shop › Extension of Time 2 - “ExoT 2”, Kilian O’Sullivan, 2014 - 2020

Extension of Time 2 - “ExoT 2”, Kilian O’Sullivan, 2014 - 2020

from £100.00

Composite Photograph of the North Elevation of Battersea Power Station

Location No. 2

Shot on the Arca Swiss F-Line Metric and Phase one digital back.

“I have been photographing Battersea Power Station's redevelopment for Battersea Power Station Development Company (BPSDC) or 6 years - 2014 - 2020, I have been photographing inside the construction site and off site from a number of locations in London.

Extension of Time is the first project to come from this body of work.

For 6 years I have made monthly visits to the same locations near the Power Station. The product of this photography are; Composite images from overlaying the same image taken over 6 years creating a ghost-like image of the subject over 6 years, grid layout images showing the subject changing over 6 years and individual photographs of the subject at a moment in time over the 6 year time span”.

Print size includes border, Vat and shipping included in the price.

Shipping destinations: UK, EU, USA & Canada, Australia and ROW.

Framed options are not available right now.

7.2" x 11.0" (18cm x 28cm) - £100.00

11.9" x 18.0" (30cm x 46cm) - £150.00

16.9" x 26.0" (43cm x 66cm) -£650.00

24.3" x 38.0" (62cm x 97cm) - £1200.00

30.5" x 48.0" (77cm x 122cm) - £1500.00

Bespoke prints can be requested and these are the maximum dimensions for a single print: cm / Inch

152.4 / 60 by 1193.8 / 470

Composite Photograph of the North Elevation of Battersea Power Station

Location No. 2

Shot on the Arca Swiss F-Line Metric and Phase one digital back.

“I have been photographing Battersea Power Station's redevelopment for Battersea Power Station Development Company (BPSDC) or 6 years - 2014 - 2020, I have been photographing inside the construction site and off site from a number of locations in London.

Extension of Time is the first project to come from this body of work.

For 6 years I have made monthly visits to the same locations near the Power Station. The product of this photography are; Composite images from overlaying the same image taken over 6 years creating a ghost-like image of the subject over 6 years, grid layout images showing the subject changing over 6 years and individual photographs of the subject at a moment in time over the 6 year time span”.

Print size includes border, Vat and shipping included in the price.

Shipping destinations: UK, EU, USA & Canada, Australia and ROW.

Framed options are not available right now.

7.2" x 11.0" (18cm x 28cm) - £100.00

11.9" x 18.0" (30cm x 46cm) - £150.00

16.9" x 26.0" (43cm x 66cm) -£650.00

24.3" x 38.0" (62cm x 97cm) - £1200.00

30.5" x 48.0" (77cm x 122cm) - £1500.00

Bespoke prints can be requested and these are the maximum dimensions for a single print: cm / Inch

152.4 / 60 by 1193.8 / 470

Size:
Frame: